Maine Link President, Bob Jones, (left) delivers Maine Link’s 25 year Parts, Labor and Workmanship Warranty to Frank Nappi Jr. President, Nappi Distributors (center) Mark Papa Project Manager (right). Another worry-free installation completed.

(Above) Nappi Distributor’s new 170,000 square foot distribution center, where Maine Link installed 12 miles of cable and 300 network drops, is a prime example of our Design Build approach to network design and construction.
(Left) Cable management at
Nappi Distributors new
state of the art distribution
center is performed to
best practices standards.
All cabling is labeled,
tested, and verified.
Below left, wiring closet before Maine Link cabling audit. Below right,
after Maine Link label, test, and verification. All cabling documented
to quickly accommodate future adds, moves, and changes.

| Network cabling
audits by Maine
Link ensure network reliability
and avoid system
downtime. |