Have A
Question
About Digital
Television?

Click Here!

Maine Link President, Bob Jones, (left) delivers Maine Link’s 25 year Parts, Labor and Workmanship Warranty to Frank Nappi Jr. President, Nappi Distributors (center) Mark Papa Project Manager (right). Another worry-free installation completed.


(Above) Nappi Distributor’s new 170,000 square foot distribution center, where Maine Link installed 12 miles of cable and 300 network drops, is a prime example of our Design Build approach to network design and construction.


(Left) Cable management at Nappi Distributors new state of the art distribution center is performed to best practices standards. All cabling is labeled, tested, and verified.




Below left, wiring closet before Maine Link cabling audit. Below right, after Maine Link label, test, and verification. All cabling documented to quickly accommodate future adds, moves, and changes.



Network cabling audits by Maine Link ensure network reliability and avoid system downtime.

BICSI Member